Showing all 2 results
Maxseal Traffic –
Cementitious Trafficable membrane is ready to go after 12-24 hours before opening to pedestrian traffic, and 24-48 hours for wheel traffic (at 20°C and 50% R.H.) depending on temperature and ventilation/humidity conditions.
So Drizoro-MultiSurface Cementitious Trafficable Waterproof Membrane can be used on a number of surfaces
Showing all 2 results